US company lands on the moon: Here’s how a KC firm helped boost its flames of innovation
February 23, 2024 | Nikki Overfelt Chifalu
For the first time ever, a commercial spacecraft has touched down on the moon and Kansas City-based Burns & McDonnell provided innovation that helped to make it possible for Intuitive Machines and its Odysseus IM-1 lander, shared Brittney Swartz.
The local engineering, construction and architecture firm served as the designer and builder of Intuitive Machines’ new $40 million headquarters and flame range test facility, which opened in September 2023 in the Houston Spaceport.
Although Burns & McDonnell was not involved with the moon mission itself, the firm’s team members still feel a sense of pride about how they helped empower the space exploration company, noted Swartz, design manager for the project and Burns & McDonnell aerospace and industrial operations manager.
“Getting to work with all those people and knowing that they put their heart and soul into that lander and to see it launch the week before and then land (Thursday), you know their hearts were huge,” she continued. “Your own heart just swells up for that, as well. It was awesome.”
“It was a fun project,” added Josh Foerschler, the Burns & McDonnell aerospace, defense, and space business development leader.
Burns & McDonnell team members held a watch party — complete with Moon Pies for snacks — Thursday evening at their Kansas City offices as the Intuitive Machines lander reached its destination; the first American spacecraft to reach the surface of the moon since the Apollo program in 1972.
“We were here quite late last night, just wanting to see those first images,” Swartz said. “It was great.”
Her team started working with Intuitive Machines on the building project in 2021, she said. At the time, the space company had its office and headquarters in a separate location than its manufacturing facility.
“Their key engineers had desks in two places, going back and forth,” Swartz explained. “And the opportunity came with Houston Spaceport to be able to build a facility there that actually was even right next door to their manufacturing space.”
As the two companies started the ideation process, Swartz noted, they realized they needed to help Intuitive Machines solve another problem: a testing facility for its lunar landing engines that wouldn’t require loading them up onto a mobile vehicular test stand, driving them to an abandoned runway, and setting them up and taking them down in the Houston heat: a process that could take around 12 hours just for one test.
So before even starting on the 105,572-square-foot headquarters, the engineering team worked with Intuitive Machines to design the flame range, consisting of a 3,800-square-foot reinforced concrete chamber surrounded by a 25-foot-high perimeter wall that encloses an additional 6,500-square-foot yard and delivers multiple advantages for Intuitive Machines testing protocols, according to Burns & McDonnell.
“This highly customized base for our aspirations goes far beyond office space,” said Jack Fischer, vice president of production and operations for Intuitive Machines at the ribbon cutting ceremony for the project in October 2023, according to a Burns & McDonnell news release. “It is an overarching complex with mission control, manufacturing and an advanced propulsion testing facility — the flame range — for the lunar lander engine. This was a facility and test area that didn’t exist before, and now, fueled by innovation, we can bring our vision to life.”
They broke ground on the flame range project in October 2021, Swartz shared, and it was up and running within nine months.
“That really launched their ability to go faster and deliver their contract with NASA even quicker,” she explained.
Burns & McDonnell’s design-build delivery method allowed the engineering team to quickly respond and adapt to the challenges of a project of this scope, Swartz noted.
“That allowed us to be able to push the flame range building forward faster,” she continued. “Then we started back on the building and that allowed them to be testing their engine, as well as us figuring out what’s that workflow process for them in their manufacturing space. So the design-build method was really the only solution for them that would have allowed that amount of flexibility to respond to their changes.”
“Having this collaborative environment that we had with the design-build mentality with their team meant that we could respond quickly to their changes and react accordingly and not extend the construction even longer,” added Foerschler. “We were solving problems on the fly.”
2024 Startups to Watch
stats here
Related Posts on Startland News
TEDx ‘breaks through’ in Wyandotte County
This year, TEDxWyandotte seeks to break down barriers in their urban community. Wyandotte County, Kan., a community known for its diversity and urban challenges, is currently in a state of transition. The county as a whole is working towards neighborhood and school improvements, ultimately hoping to claim a new position in the Kansas City metropolitan.…
KC firm Handy Camel raising $600K for invention workshop
What do sheep farming and innovation have to do with one another? Quite a lot, if North Kansas City-based Handy Camel is any indication. Since he was a boy, Handy Camel CEO Tom Gray has fostered an innovative ethos, creating a number of doodads to make his work easier as a sheep farmer in New Zealand.…
Rawxies founder: ‘I didn’t give up’ on fundraising in KC
Vegan snack manufacturer Rawxies is en route to closing a funding round that will significantly increase its production. The Kansas City-based company has now raised $512,000 of its seed round, which will boost manufacturing of its raw, vegan snacks by roughly 400 percent. Investors thus far include England’s family, Liz and Brian Kelly, the Women’s…
Meet KC’s Cisco Smart City leaders
Kansas City Mayor Sly James announced on Friday 11 people to serve on the city’s Smart City Advisory Board. With a mixture of corporate, non-profit and civic experience, the board will manage and guide policies for Kansas City’s public-private Smart City project. Announced in the summer of 2014, the project will turn downtown into a…




